14 years ago
Monday, April 5, 2010
Passing Through
Today some of the dirt was removed from the dike closures in South Pembina to allow local traffic to pass through. The road closed signs are still up and the road will remain closed (except to local traffic) until the river level drops to 47 ft.
It's time for the clean-up to begin. The unused sandbags will be moved to storage and kept for future use.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment